SUP
10/25
20FEB25/20FEB26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
10/25
AIRAC
09-JAN-25
EFFECTIVE DATE WEF
20-FEB-25
ENR
SUP
10/25
20FEB25/20FEB26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 20 February 2026 (estimated), three wind turbines will be under construction at “Monte Becerril” Wind Farm in the municipality of Becerril de Campos (Palencia).
For its construction, the installation of a mobile crane will be necessary that will move to the location of each wind turbine to proceed with its lifting.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P22-0224 MB01 Windmill | 420854.42N 0043554.05W | 1015 | 211 |
P22-0224 MB02 Windmill | 420855.59N 0043525.76W | 1011 | 211 |
P22-0224 MB03 Windmill | 420848.62N 0043511.82W | 1011 | 211 |
Mobile crane | - | - | 142 |