SUP
113/25
12JUN25/12JUN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
113/25
AIRAC
01-MAY-25
EFFECTIVE DATE WEF
12-JUN-25
ENR
SUP
113/25
12JUN25/12JUN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 12 June 2026 (estimated), eleven wind turbines will be under construction at Molar del Molinar Wind Farm, in the municipalities of Peñas de San Pedro y de Alcadozo (Albacete).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P22-0367_M10.1 Windmill | 384127.98N 0020722.83W | 1450 | 165 |
P22-0367_M10.2 Windmill | 384134.74N 0020703.00W | 1415 | 165 |
P22-0367_M10.3 Windmill | 384123.59N 0020535.51W | 1401 | 165 |
P22-0367_M10.4 Windmill | 384121.20N 0020458.66W | 1398 | 165 |
P22-0367_M10.5 Windmill | 384129.73N 0020429.53W | 1370 | 165 |
P22-0367_M10.6 Windmill | 384136.47N 0020412.14W | 1346 | 165 |
P22-0367_M10.7 Windmill | 384221.82N 0020328.33W | 1324 | 165 |
P22-0367_M10.8 Windmill | 384225.15N 0020305.72W | 1326 | 165 |
P22-0367_M10.9 Windmill | 384236.58N 0020259.65W | 1313 | 165 |
P22-0367_M10.10 Windmill | 384149.00N 0020257.22W | 1318 | 165 |
P22-0367_M10.11 Windmill | 384135.90N 0020302.40W | 1298 | 165 |
P22-0367 Mobile crane | - | - | 115 |