SUP
126/25
07AUG25/07AUG26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
126/25
AIRAC 26-JUN-25
EFFECTIVE DATE WEF 07-AUG-25
ENR
CANCEL:
SUP
126/25
07AUG25/07AUG26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 07 August 2026 (estimated), five wind turbines will be under construction at Repotenciación Montes de Cierzo II Wind Farm in the municipality of Tudela (Navarra).
For its construction, the installation of five mobiles cranes will be necessary to lift the wind turbines, but only one of them will be higher than 100 metres.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0188 MC_II-01 Windmill | 420440.47N 0014428.25W | 639 | 200 |
P23-0188 MC_II-02 Windmill | 420448.29N 0014414.13W | 639 | 200 |
P23-0188 MC_II-03 Windmill | 420456.50N 0014408.44W | 636 | 200 |
P23-0188 MC_II-04 Windmill | 420502.93N 0014354.77W | 635 | 200 |
P23-0188 MC_II-05 Windmill | 420507.20N 0014339.50W | 632 | 200 |
P23-0188 Mobile crane | - | - | 122 |