SUP
127/25
07AUG25/07AUG26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
127/25
AIRAC 26-JUN-25
EFFECTIVE DATE WEF 07-AUG-25
ENR
CANCEL:
SUP
127/25
07AUG25/07AUG26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 07 August 2026 (estimated), five wind turbines will be under construction at Repotenciación Montes de Cierzo Wind Farm in the municipality of Cintruénigo (Navarra).
For its construction, the installation of up to two mobile cranes will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P22-0234 MC_01 Windmill | 420348.12N 0014613.76W | 655 | 200 |
P22-0234 MC_02 Windmill | 420354.86N 0014558.18W | 653 | 200 |
P22-0234 MC_03 Windmill | 420401.91N 0014541.90W | 649 | 200 |
P22-0234 MC_04 Windmill | 420408.93N 0014525.66W | 646 | 200 |
P22-0234 MC_05 Windmill | 420415.73N 0014510.04W | 643 | 200 |
P22-0234 Mobile crane 1 | - | - | 125 |
P22-0234 Mobile crane 2 | - | - | 125 |