AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

127/25

AIRAC 26-JUN-25

EFFECTIVE DATE WEF 07-AUG-25

ENR

CANCEL:

SUP 

127/25

07AUG25/07AUG26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Repotenciación Montes de Cierzo Wind Farm under construction.

Until 07 August 2026 (estimated), five wind turbines will be under construction at Repotenciación Montes de Cierzo Wind Farm in the municipality of Cintruénigo (Navarra).

For its construction, the installation of up to two mobile cranes will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

 

ID

COORD

ELEV (M AMSL)

HGT (M)

P22-0234 MC_01 Windmill

420348.12N 0014613.76W

655

200

P22-0234 MC_02 Windmill

420354.86N 0014558.18W

653

200

P22-0234 MC_03 Windmill

420401.91N 0014541.90W

649

200

P22-0234 MC_04 Windmill

420408.93N 0014525.66W

646

200

P22-0234 MC_05 Windmill

420415.73N 0014510.04W

643

200

P22-0234 Mobile crane 1

-

-

125

P22-0234 Mobile crane 2

-

-

125