Until 20 February 2026 (estimated), a measurement tower will be under construction at “El Coto” Wind Farm, in the municipality of Castilruiz (Soria).
For its construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P24-0399 TM El Coto | 415205.42N 0020103.79W | 1109 | 142 |
P24-0399 Mobile crane |
|
| 155 |