SUP
140/25
04SEP25/04SEP26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
140/25
AIRAC 24-JUL-25
EFFECTIVE DATE WEF 04-SEP-25
ENR
CANCEL:
SUP
140/25
04SEP25/04SEP26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 4 September 2026 (estimated), six wind turbines will be under construction at La Senda and El Camino Wind Farms, in the municipality of Aras (Navarra).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
S1.2 | 423428.54N 0022018.92W | 963 | 190 |
S1.1 | 423444.15N 0022021.92W | 984 | 190 |
C2.2 | 423319.71N 0022035.44W | 877 | 190 |
C2.1 | 423338.66N 0022027.12W | 887 | 190 |
C1.2 | 423354.89N 0022019.50W | 914 | 190 |
C1.1 | 423411.28N 0022017.22W | 940 | 190 |
Mobile crane | - | - | 190 |