SUP
194/25
27NOV25/27NOV26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
194/25
AIRAC 16-OCT-25
EFFECTIVE DATE WEF 27-NOV-25
ENR
CANCEL:
SUP
194/25
27NOV25/27NOV26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 27 November 2026 (estimated), seven wind turbines will be under construction at Villanueva Wind Farm in the municipalities of Algámitas and Pruna (Sevilla).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0281-V101 WINDMILL | 370209.97N 0050951.91W | 784 | 190 |
P23-0281-V102 WINDMILL | 370202.36N 0051142.17W | 778 | 189 |
P23-0281-V103 WINDMILL | 370157.43N 0051022.79W | 782 | 190 |
P23-0281-V104 WINDMILL | 370229.78N 0051201.09W | 710 | 190 |
P23-0281-V105 WINDMILL | 370248.72N 0051247.02W | 675 | 190 |
P23-0281-V106 WINDMILL | 370307.54N 0051238.54W | 719 | 190 |
P23-0281-V107 WINDMILL | 370214.87N 0051025.27W | 757 | 189 |
G25-0008-MOBILE CRANE | - | - | 130 |