AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

196/25

AIRAC 16-OCT-25

EFFECTIVE DATE WEF 27-NOV-25

ENR

CANCEL:

SUP 

196/25

27NOV25/27NOV26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Josmanil Wind Farm under construction.

Until 27 November 2026 (estimated), five wind turbines will be under construction at Josmanil Wind Farm in the municipality of La Puebla de Cazalla (Sevilla).

For its construction, the installation of a mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P22-0362-JO-01-Windmill

370649.45N 0051351.47W

636

189

P22-0362-JO-02-Windmill

370623.23N 0051336.28W

637

189

P22-0362-JO-03-Windmill

370603.66N 0051445.29W

718

189

P22-0362-JO-04-Windmill

370607.49N 0051533.24W

678

190

P22-0362-JO-05-Windmill

370533.13N 0051534.85W

721

189

G25-0009-Mobile crane

-

-

130