SUP
196/25
27NOV25/27NOV26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
196/25
AIRAC 16-OCT-25
EFFECTIVE DATE WEF 27-NOV-25
ENR
CANCEL:
SUP
196/25
27NOV25/27NOV26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 27 November 2026 (estimated), five wind turbines will be under construction at Josmanil Wind Farm in the municipality of La Puebla de Cazalla (Sevilla).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P22-0362-JO-01-Windmill | 370649.45N 0051351.47W | 636 | 189 |
P22-0362-JO-02-Windmill | 370623.23N 0051336.28W | 637 | 189 |
P22-0362-JO-03-Windmill | 370603.66N 0051445.29W | 718 | 189 |
P22-0362-JO-04-Windmill | 370607.49N 0051533.24W | 678 | 190 |
P22-0362-JO-05-Windmill | 370533.13N 0051534.85W | 721 | 189 |
G25-0009-Mobile crane | - | - | 130 |