Until 27 November 2026 (estimated), five wind turbines will be under construction at Novo Wind Farm, in the municipality of Valdoviño (A Coruña).
The projected height, elevation and location of each element, which will be marked and lit, are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0004-NO01-Windmill | 433530.20N 0080721.30W | 450 | 150 |
P20-0004-NO03-Windmill | 433454.89N 0080710.03W | 449 | 150 |
P20-0004-NO04-Windmill | 433444.78N 0080702.87W | 462 | 150 |
P20-0004-NO05-Windmill | 433451.03N 0080744.33W | 424 | 150 |
P20-0004-NO06-Windmill | 433428.24N 0080727.59W | 461 | 150 |