SUP
206/25
27NOV25/27NOV26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
206/25
AIRAC 16-OCT-25
EFFECTIVE DATE WEF 27-NOV-25
ENR
CANCEL:
SUP
206/25
27NOV25/27NOV26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 27 November 2026 (estimated), eight wind turbines will be under construction at the Las Hazas Wind Farm, in the municipality of La Puebla de Cazalla (Sevilla).
For its construction, one mobile crane will be required.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (m AMSL) | HGT (m) |
---|---|---|---|
P25-0020-HA01 Windmill | 370705.14N 0051548.97W | 583 | 190 |
P25-0020-HA02 Windmill | 370751.13N 0051535.76W | 586 | 189 |
P25-0020-HA03 Windmill | 370737.25N 0051520.27W | 690 | 190 |
P25-0020-HA04 Windmill | 370723.62N 0051510.47W | 679 | 189 |
P25-0020-HA05 Windmill | 370702.91N 0051508.92W | 651 | 190 |
P25-0020-HA06 Windmill | 370654.04N 0051531.99W | 670 | 189 |
P25-0020-HA07 Windmill | 370624.42N 0051531.88W | 636 | 189 |
P25-0020-HA08 Windmill | 370721.75N 0051806.78W | 589 | 190 |
P25-0020-Mobile crane | – | – | 130 |