ENR
CANCEL:
SUP
210/25
27NOV25/27NOV26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 27 November 2026 (estimated), nine wind turbines will be under construction at Somozas Wind Farm in the municipality of As Somozas (A Coruña).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0198-SO01 WINDMILL | 433311.05N 0075355.25W | 662 | 194 |
P23-0198-SO012WINDMILL | 433255.32N 0075338.66W | 699 | 194 |
P23-0198-SO03 WINDMILL | 433257.30N 0075357.68W | 625 | 135 |
P23-0198-SO04 WINDMILL | 433208.52N 0075358.73W | 706 | 194 |
P23-0198-SO05 WINDMILL | 433118.46N 0075346.63W | 735 | 194 |
P23-0198-SO06 WINDMILL | 433133.00N 0075346.46W | 747 | 194 |
P23-0198-SO07 WINDMILL | 433109.48N 0075339.38W | 759 | 194 |
P23-0198-SO08 WINDMILL | 433156.36N 0075401.88W | 732 | 194 |
P23-0198-SO09 WINDMILL | 433101.78N 0075207.10W | 700 | 135 |
P23-0198-MOBILE CRANE | - | - | 133 |