SUP
222/25
25DEC25/25DEC26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
222/25
AIRAC 13-NOV-25
EFFECTIVE DATE WEF 25-DEC-25
ENR
CANCEL:
SUP
222/25
25DEC25/25DEC26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 25 December 2026 (estimated), three Measurement Tower will be under installation at Repotenciación Montes De Cierzo I Wind Farm in the municipality of Tudela (Navarra).
For its construction, the installation of three mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P24-0255 TM 1 | 420528.45N 0014252.21W | 528 | 120 |
P24-0255 TM 2 | 420517.94N 0014210.01W | 529 | 120 |
P24-0255 TM 3 | 420521.03N 0014154.49W | 527 | 120 |
P24-0255 Crane-1 | 420528.45N 0014252.21W | 538 | 130 |
P24-0255 Crane-2 | 420517.94N 0014210.01W | 539 | 130 |
P24-0255 Crane-3 | 420521.03N 0014154.49W | 537 | 130 |