SUP
29/25
20MAR25/20MAR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
29/25
AIRAC
06-FEB-25
EFFECTIVE DATE WEF
20-MAR-25
ENR
SUP
29/25
20MAR25/20MAR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 20 March 2026 (estimated), a measurement tower will be under construction at Santa Patricia Wind Farm, in the municipality of Gurrea de Gállego (Huesca).
The projected height, elevation and location are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P24-0457 TM Santa Patricia | 420350.41N 0004842.58W | 516 | 132 |