SUP 

59/25

AIRAC 

06-MAR-25

EFFECTIVE DATE WEF 

17-APR-25

ENR

SUP 

59/25

17APR25/17APR26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Cid III Wind Farm under construction.

Until 17 April 2026 (estimated), eight wind turbines will be under construction at Cid II Wind Farm, in the municipality of Tronchón (Teruel).

For their construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0050-CI3-01

403738.06N 0002534.39W

1449

200

P23-0050-CI3-02

403725.03N 0002547.96W

1482

200

P23-0050-CI3-03

403710.15N 0002558.19W

1498

200

P23-0050-CI3-04

403657.00N 0002609.29W

1524

200

P23-0050-CI3-05

403641.28N 0002626.87W

1539

200

P23-0050-CI3-06

403625.95N 000.2633.49W

1577

200

P23-0050-CI3-07

403552.31N 0002640.94W

1685

200

P23-0050-CI3-08

403610.48N 0002712.67W

1667

200

Mobile crane

 -

 -

140