SUP
59/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
59/25
AIRAC
06-MAR-25
EFFECTIVE DATE WEF
17-APR-25
ENR
SUP
59/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2026 (estimated), eight wind turbines will be under construction at Cid II Wind Farm, in the municipality of Tronchón (Teruel).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0050-CI3-01 | 403738.06N 0002534.39W | 1449 | 200 |
P23-0050-CI3-02 | 403725.03N 0002547.96W | 1482 | 200 |
P23-0050-CI3-03 | 403710.15N 0002558.19W | 1498 | 200 |
P23-0050-CI3-04 | 403657.00N 0002609.29W | 1524 | 200 |
P23-0050-CI3-05 | 403641.28N 0002626.87W | 1539 | 200 |
P23-0050-CI3-06 | 403625.95N 000.2633.49W | 1577 | 200 |
P23-0050-CI3-07 | 403552.31N 0002640.94W | 1685 | 200 |
P23-0050-CI3-08 | 403610.48N 0002712.67W | 1667 | 200 |
Mobile crane | - | - | 140 |