SUP
93/25
12JUN25/12JUN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
93/25
AIRAC
01-MAY-25
EFFECTIVE DATE WEF
12-JUN-25
ENR
SUP
93/25
12JUN25/12JUN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 12 June 2026 (estimated), one measurement tower will be under construction at La Arenica Wind Farm, in the municipality of Guijo de Coria (Cáceres).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P22-0236 TM | 400313.84N 0062756.65W | 525 | 124 |
P22-0236 Mobile crane | – | 534 | 133 |