SUP
02/26
19FEB26/19FEB27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
02/26
AIRAC 08-JAN-26
EFFECTIVE DATE WEF 19-FEB-26
ENR
CANCEL:
SUP
02/26
19FEB26/19FEB27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 February 2027 (estimated), one wind turbine will be under construction at the Miravete Ampliación Wind Farm, in the municipality of Valle de las Navas (Burgos).
For its construction, one mobile crane will be required.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (m AMSL) | HGT (m) |
|---|---|---|---|
AMR-01 Windmill | 422634.50N 0033645.18W | 1076 | 164 |
P25-0020-Mobile crane | – | – | 170 |