Until 16 April 2027 (estimated), five wind turbines and two meteorological towers will be under construction at Outes Wind Farm in the municipalities of Outes y Negreira (A Coruña).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P21-0474 OU03 | 425329.07N 0085233.92W | 648 | 180 |
P21-0474 OU04 | 425319.66N 0085229.13W | 670 | 180 |
P21-0474 OU05 | 425309.41N 0085224.21W | 663 | 180 |
P21-0474 OU06 | 425258.65N 0085222.34W | 645 | 180 |
P21-0474 OU07 | 425248.11N 0085219.10W | 631 | 180 |
P21-0474 TM_OU01 | 425322.66N 0085239.26W | 566 | 105 |
P21-0474 TM_OU02 | 425317.09N 0085216.79W | 588 | 105 |
P21-0474 MOBILE CRANE | - | - | 145 |