Until 19 February 2027 (estimated), one meteorological tower will be under installation Salguero Wind Farm in the municipality of Becerril de Campos (Palencia).
For its construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
Meteorological tower | 420810.30N 0043825.58W | 943 | 119 |
Mobile crane | 420810.30N 0043825.58W | 944 | 120 |