SUP
11/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
11/26
AIRAC 05-FEB-26
EFFECTIVE DATE WEF 19-MAR-26
ENR
CANCEL:
SUP
11/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), thirteen wind turbines and a meteorological tower will be under installation at El Castillar Wind Farm in the municipalities of Algora, El Sotillo y Torremocha del Campo (Guadalajara).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
CR-01 Windmill | 405557.39N 002,4027.26W | 1095 | 230 |
CR-02 Windmill | 405542.63N 002,4016.13W | 1098 | 230 |
CR-03 Windmill | 405531.14N 002,4015.60W | 1099 | 230 |
CR-04 Windmill | 405557.40N 002,3914.02W | 1106 | 230 |
CR-05 Windmill | 405455.57N 002,3857.70W | 1107 | 230 |
CR-06 Windmill | 405646.92N 002,3853.39W | 1132 | 230 |
CR-07 Windmill | 405632.79N 002,3843.88W | 1128 | 230 |
CR-08 Windmill | 405616.03N 002,3837.34W | 1125 | 230 |
CR-09 Windmill | 405558.00N 002,3825.51W | 1120 | 230 |
CR-10 Windmill | 405534.16N 002,3815.55W | 1121 | 230 |
CR-11 Windmill | 405522.19N 002,3820.18W | 1118 | 230 |
CR-12 Windmill | 405555.30N 002,3755.44W | 1118 | 230 |
CR-13 Windmill | 405447.98N 002,3753.53W | 1111 | 230 |
Meteorological tower | 405626.56N 0024044.17W | 1092 | 150 |
Mobile crane | - | - | 151 |