SUP
12/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
12/26
AIRAC 05-FEB-26
EFFECTIVE DATE WEF 19-MAR-26
ENR
CANCEL:
SUP
12/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), eleven wind turbines will be under construction at Las Tadeas Wind Farm in the municipalities of Paredes de Nava and Cerdeñosa de Volpejera (Palencia).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT(M) |
P18-0257 TA-01 | 421305.34N 0044217.78W | 1058 | 168 |
P18-0257 TA-02 | 421301.58N 0044206.84W | 1058 | 168 |
P18-0257 TA-03 | 421246.15N 0044210.70W | 1056 | 168 |
P18-0257 TA-04 | 421257.98N 0044120.81W | 1054 | 168 |
P18-0257 TA-05 | 421246.52N 0044116.52W | 1055 | 169 |
P18-0257 TA-06 | 421235.77N 0044112.97W | 1055 | 169 |
P18-0257 TA-07 | 421225.48N 0044110.60W | 1054 | 168 |
P18-0257 TA-09 | 421205.37N 0044056.30W | 1051 | 168 |
P18-0257 TA-10 | 421201.68N 0044037.76W | 1046 | 168 |
P18-0257 TA-11 | 421247.25N 0044034.86W | 1051 | 168 |
P18-0257 TA-12 | 421239.12N 0044023.65W | 1050 | 168 |
Mobile crane | - | - | 179 |