SUP
13/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
13/26
AIRAC 05-FEB-26
EFFECTIVE DATE WEF 19-MAR-26
ENR
CANCEL:
SUP
13/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), one measurement tower will be under installation at Los Caños III Wind Farm, in the municipality of Dueñas (Palencia).
For its construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P25-0133 TM | 415037.98N 0043028.31W | 882 | 122 |
P25-0133 Mobile crane | - | - | 132 |