SUP
144/26
01OCT26/01OCT27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
144/26
AIRAC 20-AUG-26
EFFECTIVE DATE WEF 01-OCT-26
ENR
CANCEL:
SUP
144/26
01OCT26/01OCT27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 01 October 2027 (estimated), a measurement tower will be under construction at Híbrido Jerez Wind Farm, in the municipality of Jerez de la Frontera (Cádiz).
The projected height, elevation and location of measurement tower are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
Measurement Tower TM P25-0291 | 364503.67N 0055755.51W | 206 | 121 |