SUP
15/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
15/26
AIRAC 05-FEV-26
EFFECTIVE DATE WEF 19-MAR-26
AD
CANCEL: SUP 184/25
SUP
15/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), works to reconfigure the East area of the apron will be carried out.
The works will take place in eleven phases, the areas affected in each one of them are those specified in the present document.
The phases might not necessarily be executed in the order defined, and several phases might be activated and deactivated simultaneously.
The start and end dates of each phase, as well as any operational incident, will be announced by the corresponding NOTAM.
All phases of the works shall be duly marked and lit. Caution is recommended due to the presence of personnel and machinery.
The works will be performed at daytime or at night time. If any action affects any airport service or operations, the day and time slot will be coordinated in order to execute the works.
PHASES
PHASE 1 . CLOSURE OF PRKG 22
Operational restrictions: PRKG 22 closed.
PHASE 2. CLOSURE OF PRKG 23A
Operational restrictions: PRKG 23A closed.
PHASE 3. CLOSURE OF PRKG 23B
Operational restrictions: PRKG 23B closed
PHASE 4. CLOSURE OF PRKG 24
Operational restrictions: PRKG 24 closed
PHASE 5. CLOSURE OF PRKG 25
Operational restrictions: PRKG 25 closed
PHASE 6. CLOSURE OF PRKG 30
Operational restrictions: PRKG 30 closed
PHASE 7. CLOSURE OF PRKG 32
Operational restrictions: PRKG 32 closed
PHASE 8. CLOSURE OF PRKG 34
Operational restrictions: PRKG 34 closed
PHASE 9: NEW AIRCRAFT STAND 21
Upon completion of the work, the configuration of the stand will be as follows:
PRKG | RAMP | COORD | EXIT | MAX ACFT | NOSE TO | REMARKS |
21 | R5 | 393305.32 N 0024348.82 E | R | B3MX | E | 400 Hz – A/C (1) |
(1) Visual docking guidance system
PHASE 10. NEW AIRCRAFT STAND 23
Upon completion of the work, the configuration of the stand will be as follows:
PRKG | RAMP | COORD | EXIT | MAX ACFT | NOSE TO | REMARKS |
23 | R7 | 393308.92 N 0024356.33 E | R | B3MX | E | - |
PHASE 11. NEW CONFIGURATION OF PRKG 2 5
Upon completion of the work, the configuration of the stand will be as follows:
PRKG | RAMP | COORD | EXIT | MAX ACFT | NOSE TO | REMARKS |
25 | R7 | 393310.20 N 0024358.88 E | R | B3MX | E | - |