SUP
24/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
24/26
AIRAC 05-FEB-26
EFFECTIVE DATE WEF 19-MAR-26
ENR
CANCEL:
SUP
24/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), six wind turbines and a meteorological tower will be under construction at Olerón Wind Farm, in the municipalities of Rois and Brión (A Coruña).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT(M) |
P21-0360 OL03 Windmill | 424843.75N 0084204.49W | 657 | 180 |
P21-0360 OL04 Windmill | 424922.25N 0084209.37W | 651 | 180 |
P21-0360 OL05 Windmill | 424912.51N 0084206.47W | 662 | 180 |
P21-0360 OL06 Windmill | 424904.55N 0084200.61W | 670 | 180 |
P21-0360 OL07 Windmill | 424834.91N 0084156.96W | 629 | 180 |
P21-0360 OL08 Windmill | 424931.88N 0084212.81W | 618 | 180 |
P21-0360 TM_OL01 Meteorological tower | 424940.87N 0084216.38W | 514 | 105 |
Mobile crane | - | - | 145 |