The following table shows the AIP supplements in force on the publication date of the present amendment and those which have been cancelled respect to the previous amendment record.
NR/YEAR | SUBJECT | SECTION AFFECTED | PERIOD OF VALIDITY | CANCELLATION RECORD |
---|---|---|---|---|
89/20 | FIR CANARIAS.- Communications tower obstacle marker out of service. | ENR | 13AUG20/13AUG21EST | From 12/03/2025 cancelled by NOTAM B1746/25 |
152/20 | FIR MADRID.- Transit Corridor established. | ENR | 31DEC20/31DEC21EST | |
38/21 | LEÓN AD.- Closed or out of service facilities. | AD | 25MAR21/25MAR22EST | From 10/02/2025 cancelled by NOTAM B0889/25 |
70/22 | SABADELL AD (LELL).- Cranes installed in the vicinity of the airport. | AD | 19MAY22/22APR23EST | |
91/22 | FIR MADRID.- Antonio Valverde Wind Farm under construction. | ENR | 14JUL22/14JUL23EST | |
110/22 | FIR MADRID.- “San Bartolomé I” Wind Farm under construction. | ENR | 08SEP22/08SEP23EST | From 17/04/2025 cancelled by AIRAC 03/25 |
117/22 | FIR MADRID.- Wind farm Polux under construction | ENR | 08SEP22/08SEP23EST | |
193/22 | MÁLAGA/Costa del Sol AD (LEMG).- Construction of two housing towers and installation of four cranes in the vicinity of the airport. | AD | 26JAN23/26JAN24EST | |
14/23 | FIR MADRID.- Buniel Wind Farm under construction. | ENR | 23FEB23/23FEB24EST | |
17/23 | PALMA DE MALLORCA AD (LEPA/LESJ).- Aircraft rescue military crane out of service. | AD | 23FEB23/23FEB24EST | |
63/23 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Several actions on the airfield. | AD | 18MAY23/18MAY24EST | |
74/23 | FIR MADRID.- Valdehierro Wind Farm under construction. | ENR | 15JUN23/15JUN24EST | |
91/23 | GRANADA/Armilla AD (LEGA).- RWY 36 PAPI unserviceable. | AD | 15JUN23/21APR24EST | From 19/02/2025 cancelled by NOTAM B1117/25 |
106/23 | FIR BARCELONA.- San Isidro II Wind Farm under construction. | ENR | 10AUG23/10AUG24EST | |
109/23 | FIR MADRID.- San Isidro Wind Farm under construction. | ENR | 10AUG23/10AUG24EST | |
111/23 | FIR BARCELONA.- Santa Cruz III Wind Farm under construction. | ENR/AD | 10AUG23/10AUG24EST | From 20/03/2025 cancelled by AIRAC 02/25 |
172/23 | FIR MADRID.- Valverde Wind Farm under construction. | ENR | 30NOV23/30NOV24EST | |
177/23 | FIR MADRID.- Canteras I Wind Farm under construction. | ENR | 30NOV23/30NOV24EST | |
178/23 | FIR MADRID.- Canteras II Wind Farm under construction. | ENR | 30NOV23/30NOV24EST | |
181/23 | FIR MADRID.- Las Sardas Wind Farm under construction. | ENR | 30NOV23/30NOV24EST | |
190/23 | SEVILLA/Morón AD (LEMO).- VOR/DME MRN unmonitored. | AD | 30NOV23/30NOV24EST | |
192/23 | SEVILLA/Morón AD (LEMO).- GCA Movement Target Indicator (MTI) U/S. | AD | 30NOV23/30NOV24EST | |
193/23 | FIR MADRID.- Las Atalayas Wind Farm under construction. | ENR | 28DEC23/28DEC24EST | |
197/23 | REUS AD (LERS).- Fuelling service available. | AD | 28DEC23/28DEC24EST | From 17/02/2025 cancelled by NOTAM B1078/25 |
198/23 | FIR MADRID.- Installation of a measuring tower within Encina Wind Farm. | ENR | 25JAN24/25JAN25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
01/24 | ZARAGOZA AD (LEZG).- Arresting system withdrawn. | AD | 25JAN24/25JAN25EST | From 03/03/2025 cancelled by NOTAM B1444/25 |
02/24 | ZARAGOZA AD (LEZG).- Instrument approach chart IAC/4 TACAN RWY 12R not usable. | AD | 25JAN24/25JAN25EST | From 20/03/2025 cancelled by SUP 18/25 |
08/24 | MURCIA/San Javier AD (LELC).- Floodlighting poles obstacles lights in civil and military aprons out of service. | AD | 25JAN24/25JAN25EST | |
09/24 | GRAN CANARIA AD (GCLP).- Restrictions in the manoeuvring area. | AD | 25JAN24/25JAN25EST | From 20/03/2025 cancelled by SUP 34/25 |
10/24 | FIR MADRID.- Meteorological tower under construction. | ENR | 22FEB24/22FEB25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
17/24 | AIS-ESPAÑA.- Military invasion of Ukraine by Russian Federation. | ENR | 21MAR24/21MAR25EST | From 20/03/2025 cancelled by SUP 40/25 |
19/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- APAPI FATO 09 out of service. | AD | 22FEB24/22FEB25EST | |
21/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Renovation of systems and weather observation sites. | AD | 21MAR24/21MAR25EST | |
22/24 | CASTELLÓN AD (LECH).- Stands closed. | AD | 21MAR24/21MAR25EST | |
23/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Residential tower under construction and installation of tower cranes in the vicinity of the airport. | AD | 22FEB24/26JAN25EST | From 12/03/2025 cancelled by NOTAM A1564/25 |
24/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Installation of double circuit on essential taxiways. | AD | 21MAR24/25FEB25EST | |
25/24 | BADAJOZ/Talavera La Real AD (LEBZ).- Right wing bar of VASIS RWY 31 out of service. | AD | 21MAR24/21MAR25EST | From 14/02/2025 cancelled by NOTAM B1026/25 |
27/24 | FIR MADRID.- Las Cerradas Wind Farm under construction. | ENR | 21MAR24/01DEC24EST | From 20/03/2025 cancelled by AIRAC 02/25 |
29/24 | FIR MADRID.- La Muela I - Santiuste wind farm under construction. | ENR | 21MAR24/21MAR25EST | |
33/24 | VIGO AD (LEVX).- Works in the movement area of Vigo airport. | AD | 21MAR24/21MAR25EST | From 15/05/2025 cancelled by AIRAC 04/25 |
35/24 | FUERTEVENTURA AD (GCFV).- Stands unavailable. | AD | 21MAR24/21MAR25EST | From 12/02/2025 cancelled by NOTAM B0936/25 |
36/24 | FIR MADRID.- El Campillo Wind Farm under construction. | ENR | 18APR24/18APR25EST | |
38/24 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Intermediate holding positions R1 and R2 unserviceable. | AD | 21MAR24/21MAR25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
41/24 | FIR MADRID.- Páramo de la Mesuca Wind Farm under construction. | ENR | 18APR24/18APR25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
42/24 | FIR MADRID.- Installation of wind turbines and measurement towers at La Cernégula Wind Farm. | ENR | 18APR24/18APR25EST | |
43/24 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Secondary power supply. | AD | 21MAR24/21MAR25EST | |
44/24 | FIR MADRID.- Possible limited radio VHF/UHF coverage in the northeastern part of the area of responsibility ECAOSEVILLA. | ENR | 21MAR24/21MAR25EST | From 17/04/2025 cancelled by SUP 75/25 |
47/24 | ZARAGOZA AD (LEZG).- Instrument approach chart IAC/10 TACAN RWY 30R from IAF YARZU not usable. | AD | 21MAR24/21MAR25EST | From 20/03/2025 cancelled by SUP 32/25 |
50/24 | FIR MADRID.- Páramo de Barril Wind Farm under construction. | ENR | 18APR24/18APR25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
51/24 | ZARAGOZA AD (LEZG).- Availability of facilities and services. | AD | 18APR24/18APR25EST | |
52/24 | FIR MADRID.- Valdemoré II Wind Farm under construction. | ENR | 18APR24/18APR25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
53/24 | FIR MADRID.- Páramo de Sardón Wind Farm under construction. | ENR | 18APR24/18APR25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
55/24 | ZARAGOZA AD (LEZG).- RPAS operations. | AD | 21MAR24/21MAR25EST |
|
58/24 | FIR MADRID.- Treboada Wind Farm under construction. | ENR | 18APR24/18APR25EST | From 20/03/2025 cancelled by SUP 46/25 |
59/24 | VALENCIA AD (LEVC).- Perpendicular slope compliance works on levelled strip. | AD | 18APR24/18APR25EST | |
61/24 | FIR MADRID.- Ventumelo Wind Farm under construction. | ENR | 16MAY24/16MAY25EST | From 27/02/2025 cancelled by NOTAM B1354/25 |
63/24 | FIR MADRID.- Jubera Wind Farm under construction. | ENR | 16MAY24/16MAY25EST | |
64/24 | SANTIAGO/Rosalía de Castro AD (LEST).- RWY 35 approach lighting system (ALS) switched on in provisional configuration. | AD | 16MAY24/16MAY25EST | From 17/04/2025 cancelled by SUP 76/25 |
66/24 | FIR MADRID.- Canteras III Wind Farm under construction. | ENR | 18APR24/18APR25EST | |
71/24 | FIR BARCELONA.- Mareas II Wind Farm under construction. | ENR | 16MAY24/16MAY25EST | From 17/04/2025 cancelled by SUP 85/25 |
72/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- DVOR BCN obstacle lights out of service. | AD | 18APR24/18APR25EST | |
73/24 | CIUDAD REAL AD (LERL).- Closure of TWY E2 and TWY T between Gate B and TWY E3. | AD | 18APR24/18APR25EST | From 20/03/2025 cancelled by SUP 50/25 |
74/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- DVOR PRA obstacle lights out of service. | AD | 18APR24/18APR25EST | From 10/02/2025 cancelled by NOTAM A0889/25 |
76/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- New standard instrument departures RNAV1 for RWY 24L. | AD | 13JUN24/13MAR25EST | |
77/24 | CASTEJÓN DE LOS MONEGROS AD RESTRINGIDO (LECJ).- Temporary closure. | AD | 16MAY24/16MAY25EST | |
79/24 | IBIZA AD (LEIB).- Towed exits from PRKG 25, 27 and 28. | AD | 16MAY24/16MAY25EST | From 15/05/2025 cancelled by AIRAC 04/25 |
80/24 | SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport. | AD | 16MAY24/16MAY25EST | |
81/24 | FIR MADRID.- Installation of a measuring tower within Wind Farm La Arenica. | ENR | 16MAY24/16MAY25EST | From 11/03/2025 cancelled by NOTAM B1726/25 |
83/24 | SANTIAGO/Rosalía de Castro AD (LEST).- Manoeuvres for entering and exiting PRKG A6, A7 and A8. | AD | 16MAY24/16MAY25EST | From 17/04/2025 cancelled by SUP 83/25 |
84/24 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- Works to reconfigure the apron. | AD | 13JUN24/18MAY25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
86/24 | ZARAGOZA AD (LEZG).- Crane installed in the vicinity of the airport. | AD | 16MAY24/16MAY25EST | |
87/24 | SANTIAGO/Rosalía de Castro AD (LEST).- Refurbishment for runway margins, taxiways and slopes in RESA and installation of centre line lighting for 180º turn on threshold RWY 35. | AD | 16MAY24/23MAR25EST | From 14/02/2025 cancelled by NOTAM A1002/24 |
91/24 | MADRID/Adolfo Suárez Madrid-Barajas (LEMD).- Resurfacing and lighting works on TWY X4 and X5. | AD | 11JUL24/11JUL25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
95/24 | FIR MADRID.- Wind turbines and one meteorological tower of Encina Wind Farm under construction. | ENR | 13JUN24/13JUN25EST | |
96/24 | LANZAROTE/César Manrique AD (GCRR).- Lighting Improvement Works. | AD | 11JUL24/11JUL25EST | From 21/03/2025 cancelled by NOTAM B2041/25 |
97/24 | FIR MADRID.- Torrecilla Wind Farm under construction. | ENR | 13JUN24/13JUN25EST | |
99/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Cranes installed in the vicinity of the airport. | AD | 13JUN24/13JUN25EST | |
101/24 | AIS-ESPAÑA.- Recommendation to flights over Afghanistan. | ENR | 13JUN24/13JUN25EST | |
102/24 | FIR MADRID.- Wind turbines of the Cavadilla Wind Farm under construction. | ENR | 13JUN24/13JUN25EST | From 20/03/2025 cancelled by SUP 30/25 |
104/24 | FIR MADRID.- Acibal Wind Farm under construction. | ENR | 13JUN24/13JUN25EST | |
105/24 | ALGECIRAS HLP (LEAG).- El Patrón Wind Farm under construction. | ENR/AD | 11JUL24/11JUL25EST | |
106/24 | FIR MADRID.- Installation of a measuring tower within Tierra de Campos 3 Wind Farm. | ENR | 11JUL24/11JUL25EST | |
107/24 | FIR MADRID .- Cerrato VI Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
108/24 | FIR MADRID.- Installation of meteorological towers at Cerrato VI Wind Farm. | ENR | 11JUL24/11JUL25EST | |
109/24 | FIR MADRID.- Cerro Cabello Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
110/24 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- Electrical improvement works II. | AD | 13JUN24/26JAN25EST | |
111/24 | FIR MADRID.- La Mudarra Norte Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
113/24 | FIR MADRID.- Airas Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
114/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Taxiing restrictions to aircraft code letter F on TWY Q9, Q10 and Q11 | AD | 11JUL24/11JUL25EST | |
115/24 | FIR MADRID .- Cascante II Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
116/24 | SEVILLA AD (LEZL).- Fix crane installed in the vicinity of the airport. | AD | 11JUL24/11JUL25EST | From 10/03/2025 cancelled by NOTAM B1683/25 |
118/24 | FIR BARCELONA.- San Roque Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
119/24 | REUS AD (LERS).- Crane installed inside ATZ REUS. | AD | 11JUL24/11JUL25EST | |
120/24 | FIR BARCELONA.- La Paul Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
122/24 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Restrictions to ILS STA RWY 29. | AD | 08AUG24/08AUG25EST | |
123/24 | SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport. | AD | 11JUL24/11JUL25EST | |
124/24 | FIR MADRID.- Jubera II Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
125/24 | FIR MADRID.- Monte Tourado Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | From 17/04/2025 cancelled by AIRAC 03/25 |
126/24 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Restrictions to RWY 32L LOC and DME MAA. | AD | 08AUG24/08AUG25EST | From 17/04/2025 cancelled by AIRAC 03/25 |
128/24 | A CORUÑA AD (LECO).- MSG crane installed in the vicinity of the airport. | AD | 08AUG24/08AUG25EST | |
130/24 | REUS AD (LERS).- Works to improve load bearing capacity on apron for PRKG 1 to 7. | AD | 05SEP24/05SEP25EST | |
131/24 | FIR MADRID.- Santos de la Piedra Wind Farm under construction | ENR | 08AUG24/08AUG25EST | |
132/24 | BILBAO AD (LEBB).- Remodelling of markings apron. | AD | 05SEP24/05SEP25EST | |
134/24 | FIR MADRID.- Iglesias Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
135/24 | FIR BARCELONA.- Erection of tower cranes. | ENR | 08AUG24/08AUG25EST | |
137/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Pavement renewal and compliance for TWY E and D. | AD | 05SEP24/05SEP25EST | |
139/24 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing of RWY 14R/32L and its associated taxiways. | AD | 05SEP24/05SEP25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
140/24 | FIR MADRID.- Installation of a wind measuring tower within Farelo Wind Farm. | ENR | 08AUG24/08AUG25EST | |
141/24 | GRAN CANARIA AD (GCLP).- Works at the access points to the thresholds of RWY 03L and 03R. | AD | 05SEP24/05SEP25EST | From 17/04/2025 cancelled by SUP 44/25 |
142/24 | VALLADOLID/Villanubla AD (LEVD).- RWY 14/32 width reduced. | AD | 05SEP24/05SEP25EST | |
143/24 | FUERTEVENTURA AD (GCFV).- Restriction to DME FUE. | AD | 03OCT24/03OCT25EST | |
145/24 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Cranes installed in the vicinity of the airport. | AD | 05SEP24/05SEP25EST | From 11/02/2025 cancelled by NOTAM B0938/25 Y NOTAM B0937/25 |
147/24 | FIR MADRID.- Dama de Baza wind farm under construction. | ENR | 03OCT24/03OCT25EST | |
148/24 | ZARAGOZA AD (LEZG).- Communications failure circuit not available (VAC 1). | AD | 05SEP24/05SEP25EST | |
149/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- 50 per cent CL TWY CN lights out of service. | AD | 05SEP24/05SEP25EST | |
150/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- 50 per cent CL TWY M7-M6 lights out of service. | AD | 05SEP24/05SEP25EST | |
152/24 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing and lighting works on TWY M33-M34. | AD | 05SEP24/05SEP25EST | |
153/24 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Declared Distances. | AD | 05SEP24/05SEP25EST | |
155/24 | SANTIAGO/Rosalía de Castro AD (LEST).- Compliance works for apron lighting. | AD | 05SEP24/31OCT25EST | |
156/24 | JEREZ AD (LEJR).- Works for the compliance of RWY 02/20 pavement. | AD | 03OCT24/03OCT25EST | |
157/24 | AIS-ESPAÑA.- RPAS flights in the Gulf of Cadiz by Nordic Unmanned. | ENR | 03OCT24/03OCT25EST | |
158/24 | FIR MADRID.- Aciberos Wind Farm under construction. | ENR | 03OCT24/03OCT25EST | |
159/24 | FIR MADRID.- Padornelo 3 Wind Farm under construction. | ENR | 03OCT24/03OCT25EST | |
160/24 | ZARAGOZA AD (LEZG).- Works for drainage adaptation at the manoeuvring area. | AD | 03OCT24/23FEB25EST | |
161/24 | FIR CANARIAS.- Instalation of Finca San Juan Wind Farm. | ENR | 03OCT24/03OCT25EST | |
162/24 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Temporary unavailability of DVOR/DME LRO. | AD | 03OCT24/13JUL25EST | |
163/24 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Actions on taxiways associated with RWY 14R/32L. | AD | 05SEP24/05SEP25EST | |
164/24 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- RWY 30 approach lighting system. | AD | 03OCT24/03OCT25EST | |
165/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- 50 per cent CL TWY L9-L14 lights out of service. | AD | 31OCT24/31OCT25EST | |
166/24 | FIR MADRID.- El Oliado Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
167/24 | FIR MADRID.- “Los Tramposos” Wind Farm under construction. | ENR | 03OCT24/03OCT25EST | |
168/24 | FIR BARCELONA.- Santa Cruz IV Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
169/24 | HUESCA/Pirineos AD (LEHC).- PRKG 1 availability. | AD | 03OCT24/07SEP25EST | |
170/24 | PAMPLONA AD (LEPP) .- Restrictions to VOR PPN. | AD | 31OCT24/31OCT25EST | |
171/24 | FIR MADRID.- Bretoña Wind Farm under construction. | ENR | 03OCT24/07SEP25EST | From 17/04/2025 cancelled by AIRAC 03/25 |
173/24 | FIR BARCELONA.- Mareas I Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
176/24 | SAN SEBASTIÁN (LESO).- Crane installed in the vicinity of the airport | AD | 03OCT24/30MAY25EST | |
177/24 | FIR MADRID.- Jerez Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
178/24 | FIR MADRID.- “San Marcos II” Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
179/24 | CASTELLÓN AD (LECH).- Temporary modification of the operational hours for public use of the aerodrome and of the rescue and fire fighting services for public use. | AD | 28NOV24/29MAR25EST | |
180/24 | FIR BARCELONA.- STEV Wind Farm under construction, coordinates correction. | ENR | 28NOV24/28NOV25EST | From 20/03/2025 cancelled by AIRAC 02/25 |
181/24 | PALMA DE MALLORCA AD (LEPA/LESJ).- Extension works of module D | AD | 28NOV24/28NOV25EST | |
183/24 | JEREZ AD (LEJR).- Restrictions to the LOC and DME associated to ILS RWY 20 (IJR) of the Jerez airport. | AD | 31OCT24/31OCT25EST | From 15/05/2025 cancelled by AIRAC 04/25 |
185/24 | BILBAO AD (LEBB).- Compliance works for apron lighting. | AD | 28NOV24/28NOV25EST | |
186/24 | MADRID / Adolfo Suárez Madrid-Barajas AD (LEMD).- TWY F4 and the section of TWY F3 between PRKG 258 and TWY F4 will remain closed. | AD | 31OCT24/31OCT25EST | |
187/24 | PALMA DE MALLORCA AD (LEPA/LESJ).- Works to expand Module A and remodel the Terminal and reconfigure aircraft stands in front of the new RFFS North. | AD | 28NOV24/28NOV25EST | |
188/24 | SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport. | AD | 28NOV24/28NOV25EST | |
189/24 | MENORCA AD (LEMH).- Pavement works on the apron. | AD | 28NOV24/28NOV25EST | |
190/24 | MÁLAGA/Costa del Sol AD (LEMG).- Crane installed in the vicinity of the airport. | AD | 28NOV24/28NOV25EST | |
191/24 | MENORCA AD (LEMH).- Works on the general aviation apron. | AD | 28NOV24/28NOV25EST | |
192/24 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Restrictions to GP and DME IAT RWY 10. | AD | 28NOV24/28NOV25EST | |
193/24 | FIR MADRID.- La Ese wind farm under construction. | ENR | 26DEC24/26DEC25EST | |
194/24 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Cranes installed in the vicinity of the airport. | AD | 28NOV24/28NOV25EST | |
196/24 | ASTURIAS AD (LEAS).- Threshold identification lights system (SLIU) of RWY 11 unserviceable. | AD | 28NOV24/28NOV25EST | From 14/02/2025 cancelled by NOTAM B0143/25 |
197/24 | VIGO AD (LEVX).- Thresholds identification lights systems of runways 01 and 19 unserviceable. | AD | 28NOV24/28NOV25EST | |
198/24 | MÁLAGA/Costa del Sol (LEMG).- Works to replace the declared take-off distances signs from intersections. | AD | 26DEC24/26JUN25EST | From 15/05/2025 cancelled by AIRAC 04/25 |
199/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Temporary closure of TWY S2. | AD | 26DEC24/26DEC25EST | |
200/24 | FIR MADRID.- “Mondigo” Win Farm under construction. | ENR | 26DEC24/26DEC25EST | |
201/24 | AIS-ESPAÑA.- Temporary suspension of RNP APCH manoeuvres to published LPV minima at airports in the Canary Islands. | ENR/AD | 26DEC24/26DEC25EST | |
202/24 | FIR MADRID.- Rueda Sur Wind 1 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
203/24 | SABADELL AD (LELL) .- PRKG 320 and 321 may only be used as stop and star-up areas for fixed-wing aircraft. | AD | 23JAN25/23JAN26EST | |
204/24 | FIR MADRID.- Installation of a measuring tower within Wind Farm Paldejas. | ENR | 23JAN25/23JAN26EST | |
205/24 | CASTELLÓN AD (LECH).- Aircraft stand closed. | AD | 26DEC24/26DEC25EST | |
206/24 | SANTIAGO/Rosalía de Castro AD (LEST).- Modification of the OCA/H Table for the ILS Z and ILS Y approaches to RWY 17. | AD | 26DEC24/26DEC25EST | |
207/24 | FIR BARCELONA.- “Les Colladetes” wind farm under construction. | ENR | 23JAN25/23JAN26EST | |
208/24 | FIR BARCELONA .- “Les Colladetes Ampliación” wind farm under construction. | ENR | 23JAN25/23JAN26EST | |
209/24 | FIR MADRID.- Installation of two measuring towers within Aldeavieja Wind Farm. | ENR | 23JAN25/23JAN26EST | From 17/04/2025 cancelled by AIRAC 03/25 |
210/24 | FIR MADRID.- Rueda Sur Wind 3 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
211/24 | FIR MADRID.- Rueda Sur Wind 2 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
212/24 | FIR MADRID.- Aldeavieja Repotenciación Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
01/25 | FIR MADRID.- La Mota Wind Farm under construction. | ENR | 20FEB25/20FEB26EST | |
02/25 | FIR MADRID.- Installation of a measuring tower “Los Caños II”. | ENR | 20FEB25/20FEB26EST | |
03/25 | FIR MADRID.- Installation of a measuring tower “EL HITO”. | ENR | 20FEB25/20FEB26EST | |
05/25 | FIR MADRID.- "A Ruña II" Wind Farm under construction. | ENR | 20FEB25/20FEB26EST | |
06/25 | MENORCA AD (LEMH).- RWY 01/19 closed due to maintenance outside the airport's operational hours. | AD | 20FEB25/20FEB26EST | From 14/03/2025 cancelled by NOTAM B1837/25 |
07/25 | IBIZA AD (LEIB).- TWY EH closed. | AD | 23JAN25/23JAN26EST | |
08/25 | FIR MADRID.- Meteorological tower under construction at wind farm Luceros. | ENR | 20FEB25/20FEB26EST | |
10/25 | FIR MADRID.- """Monte Becerril"" Wind Farm under construction." | ENR | 20FEB25/20FEB26EST | |
11/25 | EL HIERRO AD (GCHI).- TWR frequency change from 118.075 MHz to 118.100 MHz. | AD | 23JAN25/23JAN26EST | From 11/03/2025 cancelled by NOTAM B1643/25 |
12/25 | FIR MADRID.- Installation of a measuring tower within “El Coto” Wind Farm. | ENR | 20FEB25/20FEB26EST | |
13/25 | FIR MADRID.- """Salguero"" Wind Farm under construction." | ENR | 20FEB25/20FEB26EST | |
14/25 | ALBACETE AD (LEAB).- Modification of the civil aircraft apron configuration. | AD | 20FEB25/20FEB26EST | |
15/25 | ZARAGOZA AD (LEZG).- Aerodrome with operational limitations. | AD | 23JAN25/23JAN26EST | |
16/25 | FIR MADRID.- Miravete Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
17/25 | BURGOS/Villafría AD (LEBG).- Installation of a measuring tower within La Laguna Wind Farm. | ENR/AD | 20FEB25/20FEB26EST | |
18/25 | ZARAGOZA AD (LEZG).- Instrument approach chart IAC/4 TACAN Z RWY 12R not usable. | AD | 20MAR25/20MAR26EST | |
19/25 | ANDORRA-LA SEU D’URGELL AD (LESU).- Modification to operational hours for restricted use of the aerodrome. | AD | 31MAR25/16SEP25 |
|
20/25 | REUS AD (LERS).- Works to adapt the lighting systems to the new technologies and regulations. | AD | 20MAR25/20MAR26EST | |
21/25 | BILBAO AD (LEBB).- Replacement of runway edge lights and guard lights of RWY 10/28. | AD | 20FEB25/20FEB26EST | |
22/25 | LANZAROTE/César Manrique Lanzarote AD (GCRR).- Works to replace ILS/DME RWY 03 “IRR”. | AD | 20MAR25/20MAR26EST | |
23/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing works on TWY BY12. | AD | 20MAR25/20MAR26EST | |
24/25 | MENORCA AD (LEMH).- Renewal of the runway edge lighting system. | AD | 20MAR25/20MAR26EST | |
25/25 | FIR MADRID.- Las Lomas measuring tower installation. | ENR | 20MAR25/20MAR26EST | |
26/25 | FIR MADRID.- Tahivilla-Tarifa Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
27/25 | MENORCA AD (LEMH).- Renovation of the engine generator control system. | AD | 20MAR25/20MAR26EST | |
28/25 | CASTELLÓN AD (LECH).- Temporary modification of the operational hours for public use of the aerodrome and of the rescue and fire fighting services for public use. | AD | 30MAR25/25OCT25 | From 15/05/2025 cancelled by SUP 73/25 |
29/25 | FIR BARCELONA.- Installation of a measuring tower within Santa Patricia Wind Farm. | ENR | 20MAR25/20MAR26EST | |
30/25 | FIR MADRID.- Wind turbines of the Cavadilla Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
31/25 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Restrictions to VOR ALT and associated procedures. | ENR/AD | 20FEB25/20FEB26EST | |
32/25 | ZARAGOZA AD (LEZG).- Instrument approach chart IAC 12 TACAN Z RWY 30R from IAF YARZU not usable. | AD | 20MAR25/20MAR26EST | |
33/25 | FUERTEVENTURA AD (GCFV).- Airfield compliance works. | AD | 20MAR25/20MAR26EST | |
34/25 | GRAN CANARIA AD (GCLP).- Restrictions in the manoeuvring area. | AD | 20MAR25/20MAR26EST | |
35/25 | SALAMANCA/Matacán AD (LESA).- Caution with ILS GP RWY 21. | AD | 20MAR25/20MAR26EST | |
36/25 | SALAMANCA/Matacán AD (LESA).- RWY 08/26 closed. | AD | 20MAR25/20MAR26EST | |
37/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Cranes installed in the port. | AD | 17APR25/26DEC25 |
|
38/25 | FIR BARCELONA.- Concejo I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
39/25 | FIR BARCELONA.- La Vacada IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
40/25 | AIS-ESPAÑA.- Military invasion of Ukraine by Russian Federation. | ENR | 20MAR25/20MAR26EST | |
41/25 | FIR BARCELONA.- La Estrella II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
42/25 | FIR BARCELONA.- Vacada VI Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
43/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Modification to the OCA/H Table of the RNP Y approach manoeuvre to RWY 11. | AD | 20MAR25/20MAR26EST | |
44/25 | GRAN CANARIA AD (GCLP).- Works at the access points to the thresholds of RWY 03L and 03R. | AD | 17APR25/17APR26EST | From 17/04/2025 cancelled by SUP 88/25 |
45/25 | FIR MADRID.- Installation of a measuring tower within Monte Becerril Wind Farm. | ENR | 17APR25/17APR26EST | |
46/25 | FIR MADRID.- Treboada Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
47/25 | AIS-ESPAÑA.- Exercise “EAGLE EYE 25-02”. | ENR | 05MAY25/09MAY25 | From 09/05/2025 cancelled by Fecha de expiración |
48/25 | REUS AD (LERS).- Vessel crane installed in the vicinity of the airport. | AD | 20MAR25/20MAR26EST | |
49/25 | FIR BARCELONA.- Concejo II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
50/25 | CIUDAD REAL AD (LERL).- Closure of TWY E2 and TWY T between GATE B and TWY E3. | AD | 20MAR25/20MAR26EST | |
51/25 | LANZAROTE/César Manrique Lanzarote AD (GCRR).- 50 percent of RWY 03 approach lighting system out of service. | AD | 17APR25/17APR26EST | |
52/25 | FIR BARCELONA.- Concejo III Wind Farm. | ENR | 17APR25/17APR26EST | |
53/25 | FIR BARCELONA.- La Estrella IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
54/25 | ZARAGOZA AD (LEZG).- Wind turbines of the Repotenciación Muel wind farm under construction. | ENR/AD | 17APR25/17APR26EST | |
55/25 | AIS-ESPAÑA.- DYNAMIC MARINER-25/FLOTEX-25 exercise. | ENR | 24MAR25/04APR25 | From 04/04/2025 cancelled by Fecha de expiración |
56/25 | MADRID/ Adolfo Suárez Madrid- Barajas AD (LEMD).- Resurfacing on Taxiways A17 and A20 until A24. | AD | 17APR25/17APR26EST | |
57/25 | FIR BARCELONA.- El Cabecero II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
58/25 | FIR BARCELONA.- Cid II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
59/25 | FIR BARCELONA.- Cid III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
60/25 | FIR BARCELONA.- Vacada I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
61/25 | FIR BARCELONA.- Cabecero III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
62/25 | FIR BARCELONA.- Cid I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
63/25 | FIR BARCELONA.- El Cabecero IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
64/25 | FIR BARCELONA.- La Estrella I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
65/25 | FIR BARCELONA.- La Vacada III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
66/25 | FIR BARCELONA.- Cid IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
67/25 | FIR BARCELONA.- La Vacada II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
68/25 | FIR BARCELONA.- La Estrella III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
69/25 | FIR MADRID.- Blanco Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
70/25 | ASTURIAS AD (LEAS).- Unmanned aircraft flight areas. | AD | 15MAY25/15MAY26EST | |
71/25 | BARCELONA / Josep Tarradellas – El Prat AD (LEBL).- Reconfiguration of Ramp 0. | AD | 15MAY25/15MAY26EST | |
72/25 | AIS-ESPAÑA.- Airspace reservation for the Armed Forces Day (DIFAS-25) commemorative events. | ENR | 03JUN25/07JUN25 |
|
73/25 | CASTELLÓN AD (LECH).- Temporary modification of the operational hours for public use of the aerodrome and of the rescue and fire fighting services for public use. | AD | 15MAY25/25OCT25 |
|
74/25 | FIR MADRID.- La Colina Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
75/25 | FIR MADRID.- Possible limited radio VHF/UHF coverage in the northeastern part of the area of responsibility ECAO SEVILLA. | ENR | 17APR25/17APR26EST | |
76/25 | SANTIAGO/Rosalía de Castro AD (LEST).- RWY 35 approach lighting system (ALS) switched on in provisional configuration. | AD | 17APR25/17APR26EST | |
77/25 | FIR MADRID.- Arce Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
78/25 | FIR MADRID.- Los Balazos Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
79/25 | FIR MADRID.- APROC 25 exercise. | ENR | 22MAY25/30MAY25 |
|
80/25 | FIR BARCELONA.- Installation of a measuring tower within Les Cretes | ENR | 15MAY25/15MAY26EST | |
81/25 | FIR MADRID.- Parrancanas Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
82/25 | SAN SEBASTIÁN AD (LESO).- Cranes installed in the vicinity of the airport. | AD | 17APR25/17APR26EST | |
83/25 | SANTIAGO/Rosalía de Castro AD (LEST).- Manoeuvres for entering and exiting PRKG A6, A7 and A8. | AD | 17APR25/17APR26EST | |
84/25 | FIR BARCELONA.- Vacada V Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
85/25 | FIR BARCELONA.- Mareas II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
86/25 | FIR MADRID.- Melguizas Wind Farm under contruction | ENR | 15MAY25/15MAY26EST | |
87/25 | ASTURIAS AS (LEAS)..- 50 per cent of TWY B center line lighting system unserviceable.. | AD | 17APR25/17APR26EST | |
88/25 | GRAN CANARIA AD (GCLP).- Works at the access points to the thresholds of RWY 03L and 03R. | AD | 17APR25/17APR26EST | |
89/25 | FIR MADRID.- Carricondo Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
90/25 | FIR MADRID.- Plasencia Wind Farm under construction | ENR | 15MAY25/15MAY26EST | |
91/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on TWY EA5 and Ramp 23. | AD | 15MAY25/15MAY26EST | |
92/25 | PAMPLONA AD (LEPP).- Works to extend strip. | AD | 15MAY25/15MAY26EST |