SUP
091/26
14MAY26/17APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
091/26
14-MAY-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 45/25
SUP
091/26
14MAY26/17APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2027 (estimated), a measurement tower will be under construction at Monte Becerril Wind Farm, in the municipality of Becerril de Campos (Palencia).
The projected height, elevation and location of measurement tower are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
Measurement Tower TM-01 | 420859.91N 0043509.01W | 922 | 125 |