AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

129/26

09-JUL-2026

EFFECTIVE DATE WEF

ENR

CANCEL: SUP 078/26

SUP 

129/26

09JUL26/09JUL27EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Sarracín Wind Farm under construction.

Until 09 July 2027 (estimated), two wind turbines will be under construction at Sarracín Wind Farm, in the municipality of Sarracín (Burgos).

For its construction, the installation of a mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P21-0001 SA01 Windmill

420908.33N 0032526.67W

1036

139

P21-0001 SA02 Windmill

420930.26N 0032524.32W

1026

139

Mobile crane

-

-

130