AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

129/25

AIRAC 26-JUN-25

EFFECTIVE DATE WEF 07-AUG-25

ENR

SUP 

129/25

07AUG25/07AUG26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Installation of meteorological tower at Linte II Wind Farm.

Until 7 August 2026 (estimated), one meteorological tower will be under construction at Linte II Wind Farm, in the municipality of Larraga (Navarra).

The projected height, elevation and location of the element is detailed in the table below:

 

ID

COORD

ELEV (M AMSL)

HGT (M)

Meteorological tower TM1

423146.08N 0015455.05W

553

112