SUP
165/25
02OCT25/02OCT26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
165/25
AIRAC 21-AUG-25
EFFECTIVE DATE WEF 02-OCT-25
ENR
CANCEL:
SUP
165/25
02OCT25/02OCT26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 02 October 2026 (estimated), ten wind turbines and four measurement towers will be under construction at Ubierna Wind Farm in the municipality of Merindad de Rio Ubierna (Burgos).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0151 UB-01 | 423439.78N 0034150.58W | 1199 | 180 |
P23-0151 UB-02 | 423429.00N 0034139.34W | 1192 | 180 |
P23-0151 UB-03 | 423420.07N 0034116.58W | 1205 | 180 |
P23-0151 UB-04 | 423408.79N 0034102.28W | 1172 | 180 |
P23-0151 UB-05 | 423348.65N 0034054.12W | 1167 | 195 |
P23-0151 UB-06 | 423444.82N 0034021.20W | 1185 | 180 |
P23-0151 UB-07 | 423440.26N 0034008.16W | 1198 | 180 |
P23-0151 UB-08 | 423436.41N 0033954.69W | 1166 | 180 |
P23-0151 UB-09 | 423428.87N 0033934.30W | 1170 | 195 |
P23-0151 UB-10 | 423424.27N 0033915.18W | 1171 | 195 |
P23-0151 UB-TM | 423344.40N 0034111.35W | 1081 | 113 |
P23-0151 TM Provisional 1 | 423429.00N 0034139.34W | 1125 | 113 |
P23-0151 TM Provisional 2 | 423348.65N 0034054.12W | 1086 | 113 |
P23-0151 TM Provisional 3 | 423422.86N 0034153.93W | 1126 | 113 |
P23-0151 Mobile crane | - | - | 150 |