SUP
236/25
22JAN26/22JAN27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
236/25
AIRAC 11-DEC-25
EFFECTIVE DATE WEF 22-JAN-26
ENR
CANCEL:
SUP
236/25
22JAN26/22JAN27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 22 January 2027 (estimated), the replacement of wind turbines CENER-A2 and CENER-A3 at the “Sierra de Alaiz” Experimental Wind Farm, located within the municipalities of Unzué, Monreal and Noain (Valle de Elorz) (Navarra), will be carried out.
The projected height, elevation and location of each wind turbine after the replacement are detailed in the table below.
ID | COORD | ELEV (M AMSL) | HGT (M) |
CENER-A2 | 424130.94N 0013358.88W | 1302 | 180 |
CENER-A3 | 424132.39N 0013345.27W | 1326 | 212 |