SUP
23/25
20MAR25/20MAR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
23/25
AIRAC
06-FEB-25
EFFECTIVE DATE WEF
20-MAR-25
AD
SUP
23/25
20MAR25/20MAR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 20 March 2026 (estimated) resurfacing and lighting works will take place on TWY BY12.
The work areas will be duly marked and lit by day and by night.
The works will be carried out in 2 phases. The start and end dates, as well as any operational incidents that may arise, will be announced via the corresponding NOTAM.
Standard taxiing routes will be modified, therefore ATC instructions for taxing must be followed.
In the event that LVP are activated, the works will be cancelled.
Caution is recommended due to the presence of personnel and machinery. Taxiing must be accomplished at minimum power on diversions to prevent the impact of jet efflux in zones where personnel are working.
Operational restrictions:
• TWY BY12, BY11 and EC9: closed.
• TWY B12: downgraded to maximum Code letter E aircraft.
Schedule: H24.
Operational restrictions:
• TWY BY12, BY11 and EC9: closed.
• TWY M34: downgraded to maximum Code letter D aircraft.
• TWY B12: downgraded to maximum Code letter E aircraft.
Schedule: H24.