SUP
26/25
20MAR25/20MAR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
26/25
AIRAC
06-FEB-25
EFFECTIVE DATE WEF
20-MAR-25
ENR
SUP
26/25
20MAR25/20MAR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 20 March 2026 (estimated), thirteen wind turbines will be under construction at Tahivilla-Tarifa Wind Farm in the municipality of Tarifa (Cádiz).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0255 ER2 | 361202.60N 0054707.37W | 293 | 250 |
P23-0255 ER3 | 361148.91N 0054713.24W | 291 | 248 |
P23-0255 ER1 | 360946.77N 0054428.39W | 297 | 254 |
P23-0255 RA1 | 361138.29N 0054717.83W | 305 | 262 |
P23-0255 RA2 | 361127.77N 0054722.34W | 310 | 267 |
P23-0255 LM2 | 361117.31N 0054726.93W | 300 | 257 |
P23-0255 LM1 | 361053.17N 0054718.75W | 308 | 266 |
P23-0255 EG4 | 361042.79N 0054721.43W | 311 | 268 |
P23-0255 EG3 | 361033.24N 0054724.57W | 296 | 253 |
P23-0255 EG2 | 361024.46N 0054820.96W | 319 | 277 |
P23-0255 EG1 | 361037.38N 0054813.94W | 322 | 280 |
P23-0255 CI1 | 360936.61N 0054422.63W | 315 | 273 |
P23-0255 CI2 | 360926.66N 0054416.93W | 334 | 292 |
Mobile crane | - | - | 174 |