AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

30/25

AIRAC 

06-FEB-25

EFFECTIVE DATE WEF 

20-MAR-25

ENR

CANCEL: 102/24

SUP 

30/25

20MAR25/20MAR26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Wind turbines of the Cavadilla Wind Farm under construction.

Until 20 March 2026 (estimated), nine wind turbines will be under construction at the Cavadilla Wind Farm, in the municipalities of Villaviudas, Valle de Cerrato and Baltanás (Palencia).

For their construction, the installation of one mobile crane (lit) will be necessary.

The projected height, elevation and location of each one of these elements, which will be properly marked and lit (except P19-0219 WTG05), are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P19-0219 WTG-01

415447.11N 0041928.19W

1088

200

P19-0219 WTG-03

415508.23N 0041935.68W

1087

200

P19-0219 WTG-04

415519.05N 0041957.16W

1085

200

P19-0219 WTG-05

415531.50N 0042005.79W

1087

200

P19-0219 WTG-06

415554.95N 0042019.78W

1085

200

P21-0688 WTG-06

415609.44N 0042032.99W

1064

180

P21-0688 WTG-07

415430.66N 0042059.79W

1066

180

P21-0688 WTG-08

415446.75N 0042107.37W

1068

180

P21-0688 WTG-09

415501.92N 0042116.12W

1067

180

P19-0219 Mobile crane

148