SUP
34/25
20MAR25/20MAR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
34/25
AIRAC 06-FEB-25
EFFECTIVE DATE WEF 20-MAR-25
AD
CANCEL: SUP 09/24
SUP
34/25
20MAR25/20MAR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 20 March 2026 (estimated), there will be restrictions in the manoeuvring area of the Gran Canaria Airport.
There will be a single access to RWY 03L through TWY Z2.
There will be a single access to RWY 03R through TWY R1.
Special attention at the fork between TWY R1 and TWY Z2 to access the correct runway.
TWY Z1, Z3, Z5 and Z6 will remain closed, being able to be opened and closed by the corresponding NOTAM.
The curve holding position of TWY R1, will be the last holding position for access to RWY 03R, do not cross without the express clearance of ATC.
The taxi through TWY Z4 penetrates the RWY 03L approach surface and the ILS RWY 03L critical area.