Until 17 April 2026 (estimated), Concejo I Wind Farm will be under construction , in the municipalities of La Iglesuela del Cid (Teruel).
For its construction the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0047-CJ1-01 TURBINA EOLICA | 402954.8317N 0001948.5604W | 1599 | 200 |
P23-0047-CJ1-05 TURBINA EOLICA | 402958.5883N 0001754.1728W | 1501 | 200 |
P23-0047-CJ1-06 TURBINA EOLICA | 403009.0953N 0001738.8123W | 1506 | 200 |
P23-0047-CJ1-07 TURBINA EOLICA | 403002.7876N 0001706.3147W | 1476 | 200 |
P23-0047-CJ1-08 TURBINA EOLICA | 402937.6021N 0001753.7553W | 1489 | 200 |
P23-0047-CJ1-TM TORRE | 403018.3462N 0001723.9965W | 1415 | 120 |