AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

38/25

AIRAC 

06-MAR-25

EFFECTIVE DATE WEF 

17-APR-25

ENR

SUP 

38/25

17APR25/17APR26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Concejo I Wind Farm under construction.

Until 17 April 2026 (estimated), Concejo I Wind Farm will be under construction , in the municipalities of La Iglesuela del Cid (Teruel).

For its construction the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0047-CJ1-01  TURBINA EOLICA

402954.8317N 0001948.5604W

1599

200

P23-0047-CJ1-05  TURBINA EOLICA

402958.5883N 0001754.1728W

1501

200

P23-0047-CJ1-06  TURBINA EOLICA

403009.0953N 0001738.8123W

1506

200

P23-0047-CJ1-07  TURBINA EOLICA

403002.7876N 0001706.3147W

1476

200

P23-0047-CJ1-08  TURBINA EOLICA

402937.6021N 0001753.7553W

1489

200

P23-0047-CJ1-TM TORRE

403018.3462N 0001723.9965W

1415

120