SUP
39/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
39/25
AIRAC
06-MAR-25
EFFECTIVE DATE WEF
WEF 17-APR-25
ENR
SUP
39/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2026 (estimated), five wind turbines and one measuring tower will be under construction at La Vacada IV Wind Farm, in the municipalities of Puertomingalvo y Mosqueruela (Teruel).
For its construction the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0297-VA4-01 | 402142.77N 0002918.88W | 1911 | 200 |
P20-0297-VA4-02 | 402124.40N 0002929.42W | 1920 | 200 |
P20-0297-VA4-05 | 402040.67N 0002943.62W | 1929 | 200 |
P20-0297-VA4-06 | 402032.36N 0003002.75W | 1941 | 200 |
P20-0297-VA4-07 | 402022.83N 0003020.73W | 1954 | 200 |
P20-0297-VA4-TM | 402126.15N 0002944.31W | 1847 | 120 |
P19-0219 Mobile crane | – | – | 140 |