SUP
41/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
41/25
AIRAC
06-MAR-25
EFFECTIVE DATE WEF
17-APR-25
ENR
SUP
41/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2026 (estimated), seven wind turbines will be under construction at La Estrella II Wind Farm in the municipality of Mosqueruela (Teruel).
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELV (M AMSL) | HGT (M) |
P23-0044-LE2-01 | 402046.69N 0002300.26W | 1704 | 200 |
P23-0044-LE2-03 | 402023.86N 0002451.24W | 1711 | 200 |
P23-0044-LE2-04 | 402110.67N 0002233.73W | 1685 | 200 |
P23-0044-LE2-05 | 402045.66N 0002424.36W | 1704 | 200 |
P23-0044-LE2-06 | 402055.97N 0002359.36W | 1686 | 200 |
P23-0044-LE2-07 | 402052.63N 0002332.37W | 1690 | 200 |
P23-0044-LE2-08 | 402047.26N 0002236.84W | 1697 | 200 |