SUP
42/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
42/25
AIRAC
06-MAR-25
EFFECTIVE DATE WEF
17-APR-25
ENR
SUP
42/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2026 (estimated), seven wind turbines and a measuring tower will be under construction at Vacada VI Wind Farm in the municipality of Mosqueruela (Teruel).
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0059-VA6-01 | 402440.58N 0002858.80W | 1932 | 200 |
P23-0059-VA6-02 | 402421.98N 0002912.90W | 1961 | 200 |
P23-0059-VA6-03 | 402413.53N 0002931.75W | 1993 | 200 |
P23-0059-VA6-04 | 402408.70N 0002952.67W | 2037 | 200 |
P23-0059-VA6-05 | 402335.12N 0002938.56W | 2003 | 200 |
P23-0059-VA6-06 | 402325.99N 0002957.74W | 2031 | 200 |
P23-0059-VA6-07 | 402317.63N 0003016.82W | 2012 | 200 |
P23-0059-VA6-TM | 402334.47N 0003015.52W | 1954 | 120 |