SUP
45/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
45/25
AIRAC
06-MAR-25
EFFECTIVE DATE WEF
17-APR-25
ENR
SUP
45/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2026 (estimated), a measurement tower will be under construction at Monte Becerril Wind Farm, in the municipality of Becerril de Campos (Palencia).
The projected height, elevation and location of measurement tower are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
Measurement Tower TM-01 | 420859.91N 0043509.01W |
922 |
125 |