AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

49/25

AIRAC 

06-MAR-25

EFFECTIVE DATE WEF 

17-APR-25

ENR

SUP 

49/25

17APR25/17APR26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Concejo II Wind Farm under construction.

Until 17 April 2026 (estimated), Concejo II Wind Farm will be under construction in the municipalities of La Iglesuela del Cid and Cantavieja (Teruel).

For its construction the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0052-CJ2-01

402849.66N 0002128.73W

1784

200

P23-0052-CJ2-02

402846.54N 0002148.48W

1789

200

P23-0052-CJ2-03

402837.01N 0002204.27W

1787

200

P23-0052-CJ2-04

402743.45N 0002324.64W

1902

200

P23-0052-CJ2-05

402718.49N 0002259.29W

1955

200

P23-0052-CJ2-06

402829.82N 0002005.90W

1742

200

P23-0052-CJ2-07

402817.82N 0002017.77W

1745

200

P23-0052-CJ2-08

402808.03N 0002034.15W

1739

200

Mobile crane

-

-

140