AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

58/25

AIRAC 

06-MAR-25

EFFECTIVE DATE WEF 

17-APR-25

ENR

SUP 

58/25

17APR25/17APR26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Cid II Wind Farm under construction.

Until 17 April 2026 (estimated), seven wind turbines will be under construction at Cid II Wind Farm, in the municipalities of Villarluengo and Tronchón (Teruel).

For their construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0045-CI2-01

403807.80N 0002652.25W

1455

200

P23-0045-CI2-02

403752.63N 0002701.43W

1490

200

P23-0045-CI2-03

403733.77N 0002707.63W

1490

200

P23-0045-CI2-04

403635.72N 0002751.45W

1659

200

P23-0045-CI2-05

403714.42N 0002740.58W

1573

200

P23-0045-CI2-06

403702.83N 0002754.43W

1602

200

P23-0045-CI2-07

403627.35N 0002822.36W

1669

200

Mobile crane

 

 

140