SUP
60/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
60/25
AIRAC
06-MAR-25
EFFECTIVE DATE WEF
17-APR-25
ENR
SUP
60/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2026 (estimated), seven wind turbines and a measuring tower will be under construction at Vacada I Wind Farm in the municipality of Mosqueruela (Teruel).
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0056-VA1-01 | 402743.81N 0002710.11W | 1864 | 200 |
P23-0056-VA1-02 | 402725.77N 0002715.67W | 1864 | 200 |
P23-0056-VA1-03 | 402654.15N 0002752.53W | 1874 | 200 |
P23-0056-VA1-04 | 402642.83N 0002814.38W | 1882 | 200 |
P23-0056-VA1-05 | 402631.75N 0002845.78W | 1915 | 200 |
P23-0056-VA1-06 | 402615.13N 0002849.63W | 1888 | 200 |
P23-0056-VA1-07 | 402559.14N 0002858.24W | 1885 | 200 |
P23-0056-VA1-TM | 402650.53N 0002804.84W | 1789 | 120 |