AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

61/25

AIRAC 

06-MAR-25

EFFECTIVE DATE WEF 

17-APR-25

ENR

 

SUP 

61/25

17APR25/17APR26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Cabecero III Wind Farm under construction.

Until 17 April 2026 (estimated), six wind turbines will be under construction at Cabecero III Wind Farm, in the municipality of Fortanete (Teruel).

For their construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0049-CB3-01

402838.10N 0003224.63W

1928

200

P23-0049-CB3-02

402823.97N 0003237.00W

1949

200

P23-0049-CB3-03

402818.58N 0003259.79W

1976

200

P23-0049-CB3-04

402811.16N 0003319.88W

2011

200

P23-0049-CB3-05

402759.40N 0003344.93W

1999

200

P23-0049-CB3-07

402849.52N 0003355.31W

1960

200

Mobile crane

-

-

140