AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

62/25

AIRAC 

06-MAR-25

EFFECTIVE DATE WEF 

17-APR-25

ENR

 

SUP 

62/25

17APR25/17APR26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Cid I Wind Farm under construction.

Until 17 April 2026 (estimated), eight wind turbines and a measurement tower will be under construction at Cid I Wind Farm, in the municipality of Cantavieja (Teruel).

For their construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

CI1-01

403218.76N 0001847.76W

1476

200

CI1-02

403207.66N 0001902.91W

1472

200

CI1-03

403212.94N 0001931.64W

1491

200

CI1-04

403159.80N 0001944.36W

1501

200

CI1-05

403148.30N 0001958.63W

1509

200

CI1-06

403133.87N 0002010.00W

1522

200

CI1-TM

403224.19N 0001859.74W

1399

120

Mobile crane

-

-

140