Until 17 April 2026 (estimated), eight wind turbines and a measurement tower will be under construction at Cid I Wind Farm, in the municipality of Cantavieja (Teruel).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
CI1-01 | 403218.76N 0001847.76W | 1476 | 200 |
CI1-02 | 403207.66N 0001902.91W | 1472 | 200 |
CI1-03 | 403212.94N 0001931.64W | 1491 | 200 |
CI1-04 | 403159.80N 0001944.36W | 1501 | 200 |
CI1-05 | 403148.30N 0001958.63W | 1509 | 200 |
CI1-06 | 403133.87N 0002010.00W | 1522 | 200 |
CI1-TM | 403224.19N 0001859.74W | 1399 | 120 |
Mobile crane | - | - | 140 |