FIR BARCELONA.- El Cabecero IV Wind Farm under construction.

Until 17 April 2026 (estimated), six wind turbines will be under construction at El Cabecero IV Wind Farm in the municipality of Fortanete (Teruel).

For its construction, the installation of a mobile crane will be necessary which will move to the location of each wind turbine to proceed with its lifting.

The projected height, elevation and location of each element are detailed in the table below:

OBST

COORD

ELEV (M AMSL)

HGT (M)

P23-0041-CB4-01 Windmill

402832.15N 0003412.58W

1939

200

P23-0041-CB4-03 Windmill

402938.55N 0003439.79W

1890

200

P23-0041-CB4-04 Windmill

402924.71N 0003451.20W

1898

200

P23-0041-CB4-05 Windmill

402908.99N 0003500.48W

1918

200

P23-0041-CB4-06 Windmill

402932.88N 0003309.18W

1884

200

P23-0041-CB4-07 Windmill

402919.12N 0003325.61W

1919

200

P23-0041-CB4-GM Mobile Crane

-

-

140