SUP
64/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
64/25
AIRAC
06-MAR-25
EFFECTIVE DATE WEF
17-APR-25
ENR
SUP
64/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2026 (estimated), eight wind turbines will be under construction at La Estrella I Wind Farm, in the municipalities of Mosqueruela (Teruel).
The projected height, elevation and location of each one of these elements, are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0043-LE1-01 | 402236.86N 0002356.80W | 1735 | 200 |
P23-0043-LE1-02 | 402223.67N 0002407.52W | 1713 | 200 |
P23-0043-LE1-03 | 402226.41N 0002458.98W | 1748 | 200 |
P23-0043-LE1-04 | 402241.52N 0002447.29W | 1745 | 200 |
P23-0043-LE1-05 | 402255.64N 0002433.22W | 1765 | 200 |
P23-0043-LE1-06 | 402320.20N 0002424.90W | 1814 | 200 |
P23-0043-LE1-07 | 402331.28N 0002410.27W | 1835 | 200 |
P23-0043-LE1-08 | 402411.00N 0002411.46W | 1836 | 200 |