AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

66/25

AIRAC 

06-MAR-25

EFFECTIVE DATE WEF 

17-APR-25

ENR

SUP 

66/25

17APR25/17APR26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Cid IV Wind Farm under construction.

Until 17 April 2026 (estimated), six wind turbines and one measuring tower will be under construction at Cid IV Wind Farm, in the municipalities of Mirambel y Cantavieja (Teruel).

For its construction the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COOR

ELEV (M AMSL)

HGT (M)

P23-0051-CI4-01

403454.69N 0002410.28W

1510

200

P23-0051-CI4-02

403452.09N 0002430.33W

1564

200

P23-0051-CI4-03

403441.97N 0002446.20W

1608

200

P23-0051-CI4-04

403441.94N 0002347.34W

1508

200

P23-0051-CI4-06

403328.68N 0002406.81W

1676

200

P23-0051-CI4-07

403336.36N 0002347.93W

1681

200

P23-0051-CI4-TM

403341.89N 0002404.55W

1599

120

Mobile crane

-

-

140