Until 17 April 2026 (estimated), six wind turbines and one measuring tower will be under construction at Cid IV Wind Farm, in the municipalities of Mirambel y Cantavieja (Teruel).
For its construction the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COOR | ELEV (M AMSL) | HGT (M) |
P23-0051-CI4-01 | 403454.69N 0002410.28W | 1510 | 200 |
P23-0051-CI4-02 | 403452.09N 0002430.33W | 1564 | 200 |
P23-0051-CI4-03 | 403441.97N 0002446.20W | 1608 | 200 |
P23-0051-CI4-04 | 403441.94N 0002347.34W | 1508 | 200 |
P23-0051-CI4-06 | 403328.68N 0002406.81W | 1676 | 200 |
P23-0051-CI4-07 | 403336.36N 0002347.93W | 1681 | 200 |
P23-0051-CI4-TM | 403341.89N 0002404.55W | 1599 | 120 |
Mobile crane | - | - | 140 |