SUP
68/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
68/25
AIRAC
06-MAR-25
EFFECTIVE DATE WEF
17-APR-25
ENR
SUP
68/25
17APR25/17APR26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 17 April 2026 (estimated), seven wind turbines and a meteorological tower will be under construction at the La Estrella III Wind Farm, in the municipality of Puertomingalvo (Teruel).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0046-LE3-01 | 401917.47N 0002651.98W | 1768 | 200 |
P23-0046-LE3-02 | 401931.79N 0002636.91W | 1763 | 200 |
P23-0046-LE3-03 | 401937.71N 0002614.18W | 1745 | 200 |
P23-0046-LE3-04 | 401857.02N 0002640.72W | 1758 | 200 |
P23-0046-LE3-05 | 401907.76N 0002600.15W | 1723 | 200 |
P23-0046-LE3-06 | 401902.00N 0002531.65W | 1704 | 200 |
P23-0046-LE3-07 | 401855.66N 0002503.38W | 1697 | 200 |
P23-0046-LE3-TM Meteorological tower | 401927.67N 0002658.42W | 1701 | 120 |
P23-0046-LE3-01 Mobile crane | - | - | 140 |