SUP
69/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
69/25
AIRAC
03-APR-25
EFFECTIVE DATE WEF
15-MAY-25
ENR
SUP
69/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 15 May 2026 (estimated), seven wind turbines will be under construction at the Blanco Wind Farm, in the municipalities of Cúllar and Caniles (Granada).).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each one of these elements, which will be properly marked and lit , are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0205_BL-01 | 372547.40N 0023445.18W | 1298 | 188 |
P20-0205_BL-02 | 372601.25N 0023442.25W | 1305 | 188 |
P20-0205_BL-03 | 372615.88N 0023442.41W | 1299 | 188 |
P20-0205_BL-05 | 372641.01N 0023420.13W | 1303 | 188 |
P20-0205_BL-09 | 372748.81N 0023442.18W | 1285 | 188 |
P20-0205_BL-10 | 372801.66N 0023412.67W | 1301 | 188 |
P20-0205_BL-11 | 372815.26N 0023347.43W | 1332 | 188 |
Mobile crane | – | – | 130 |