AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

69/25

AIRAC 

03-APR-25

EFFECTIVE DATE WEF 

15-MAY-25

ENR

SUP 

69/25

15MAY25/15MAY26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Blanco Wind Farm under construction.

Until 15 May 2026 (estimated), seven wind turbines will be under construction at the Blanco Wind Farm, in the municipalities of Cúllar and Caniles (Granada).).

For their construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each one of these elements, which will be properly marked and lit , are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P20-0205_BL-01

372547.40N 0023445.18W

1298

188

P20-0205_BL-02

372601.25N 0023442.25W

1305

188

P20-0205_BL-03

372615.88N 0023442.41W

1299

188

P20-0205_BL-05

372641.01N 0023420.13W

1303

188

P20-0205_BL-09

372748.81N 0023442.18W

1285

188

P20-0205_BL-10

372801.66N 0023412.67W

1301

188

P20-0205_BL-11

372815.26N 0023347.43W

1332

188

Mobile crane

130