AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

71/25

AIRAC 

03-APR-25

EFFECTIVE DATE WEF 

15-MAY-25

AD

SUP 

71/25

15MAY25/15MAY26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

BARCELONA/Josep Tarradellas-El Prat AD (LEBL).- Reconfiguration of Ramp 0.

Until 15 May 2026 (estimated), works will be under way in the airfield at BARCELONA/Josep Tarradellas Barcelona-El Prat Airport to reconfigure the aircraft stands on Ramp 0 and Ramp 1.

WORK PHASES AND AVAILABILITY OF STANDS

The works will be carried out in 7 phases.

The start and end dates of the phases, as well as any operational incidents that may arise, will be announced via NOTAM.

During the works, the aircraft stands will be modified, replacing existing stands with new stands in a different location.

  • The maps for each phase are included in Annex 1.

  • Annex 2 displays a table summarising the availability of stands for each phase.

  • Annex 3 indicates the coordinates of the stands to be put into service.

GENERAL RULES IN PLACE DURING THE EXECUTION OF THE WORKS

  • The following requirements shall be taken into account during the execution of the works:

  • The works shall be duly marked and lit by day and by night.

  • Taxiing routes shall be adjusted according to ATC and/or SDP instructions.

  • Caution is recommended due to the presence of personnel and machinery.

  • Taxiing must be accomplished at minimum power on diversions to prevent the impact of jet efflux in zones where personnel are working.

  • Aircraft access to stands will be guided by the airport signalling service (Runway and Apron Service).

  • Aircraft exits from the new stands will be supervised by the Runway and Apron Service during the course of the works.

  • Ground handling agents must make available towing equipment to operators for aircraft exiting the stand.

  • Work will be carried out on TWY U1, U2 and U3 preferably during daytime hours, with occasional closures of the taxiway with a PPR of 30 minutes.

ANNEX 1: CONSTRUCTION PHASE MAPS

  • Stands in red: Out of service during the execution of the indicated phase of works

  • Stands in green: New stands placed into service during the indicated construction phase

  • Stands in orange: Existing stands where the direction of entry is altered during the indicated phase of the works

  • Stands in black: stands in service that were also in service in previous phases (no changes)

Below are the different figures:

PHASE 1

PHASE 2A

PHASE 2B

PHASE 3

PHASE 4A

PHASE 4B

PHASE 5

Final situation

ANNEX 2: STAND AVAILABILITY BY PHASE OF WORKS

The table displays changes to stands for each phase of the works.

Initial

Phase 1

Phase 2A

Phase 2B

Phase 3

Phase 4A

Phase 4B

Phase 5

News

01

02

03

04

10

11

11

12

12

13

13

14

14

15

15

20

20

21

21

22

22

23

23

24

24

25

25

26

30

30

31

31

32

32

33

33

34

34

35

35

36

37

38

40

40

41

41

42

42

43

44

44A

45

46

46A

47

48

48A

49

50

51

51

52

52

53

53

54

54

55

55

56

57

60

61

61

62

62

63

63

64

66

67

68

 

Stand in service at the start of the works

Unserviced or non-existent stand.

New stand in service.

 

ANNEX 3: COORDINATES OF THE NEW STANDS

PRKG

RAMP

COORD

10

R0

411828.19N 0020520.87E

11

R0

411828.73N 0020522.26E

12

R0

411829.22N 0020523.68E

13

R0

411829.70N 0020525.09E

14

R0

411830.18N 0020526.50E

15

R0

411830.96N 0020527.51E

20

R0

411827.50N 0020520.43E

21

R0

411827.83N 0020521.39E

22

R0

411828.15N 0020522.34E

23

R0

411828.48N 0020523.30E

24

R0

411828.81N 0020524.25E

25

R0

411829.14N 0020525.21E

30

R0

411825.64N 0020521.45E

31

R0

411825.91N 0020522.23E

32

R0

411826.17N 0020523.01E

33

R0

411826.44N 0020523.80E

34

R0

411826.71N 0020524.58E

35

R0

411826.98N 0020525.36E

40

R0

411824.13N 0020522.36E

41

R0

411824.40N 0020523.14E

42

R0

411824.67N 0020523.92E

50

R0

411823.11N 0020518.47E

51

R0

411824.12N 0020517.95E

52

R0

411825.10N 0020517.36E

53

R0

411826.08N 0020516.77E

54

R0

411826.99N 0020515.62E

55

R0

411828.16N 0020515.04E

60

R1

411821.92N 0020515.61E

61

R1

411821.85N 0020514.52E

62

R1

411822.64N 0020515.18E

64

R1

411823.37N 0020514.74E

65

R1

411823.09N 0020513.93E

66

R1

411824.10N 0020514.30E

67

R1

411824.29N 0020513.21E

68

R1

411824.82N 0020513.86E